Estimation to Practicability of the Building Substation by Voltage 330 sQ with Three Power Transformers
It is installed that hooking two lines and two transformers at scheme distributing device by voltage 330 sQ «transformers – a buses with joining line through two breakers» and three installed transformer on substations brings about reduction of the factor to unavailability in 18,2 times in contrast...
Saved in:
Main Authors: | M. A. Korotkevich, A. L. Starzhinsky |
---|---|
Format: | Article |
Language: | Russian |
Published: |
Belarusian National Technical University
2012-12-01
|
Series: | Известия высших учебных заведений и энергетических объединенний СНГ: Энергетика |
Online Access: | https://energy.bntu.by/jour/article/view/180 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Determination of Capacities of Two-Circuit Open-Air Electric Power Lines with Voltage of 35 kV
by: M. A. Korotkevich, et al.
Published: (2004-10-01) -
Assessment of reliability parameters of in-plant power supply schemes with two-transformer substations
by: Petrova R. M., et al.
Published: (2024-12-01) -
Analysis of Transformer Insulation Risk Due to Back Flashover Lightning on High Voltage Substations by Considering the Effect of Environmental Pollution
by: Faridoddin Safaei, et al.
Published: (2024-04-01) -
Reliability Indicators of Urban Electric Network Schemes for Supply of Second and Third Category Consumers
by: M. A. Korotkevich, et al.
Published: (2012-10-01) -
Fe, Zn AND S CONTENT IN DOUBLED HAPLOID LINES OF CHINESE SPRING × SQ1 WHEAT POPULATION
by: A. I. Abugalieva, et al.
Published: (2014-12-01)