Evolution Process and Impact Analysis of the Dam-break Flood of Baihuatan Hydropower Station Based on HEC-RAS

Once the reservoir is destroyed,it will bring huge damage to peoples lives and regional economic development.This paper extracts the topographic information of the upstream and downstream of Baihuatan Hydropower Station by Google Earth and Arc-GIS,establishes a numerical analysis model of the river...

Full description

Saved in:
Bibliographic Details
Main Authors: JIANG Linjie, FU Chenghua, CHENG Xinyu, LIU Jian
Format: Article
Language:zho
Published: Editorial Office of Pearl River 2021-01-01
Series:Renmin Zhujiang
Subjects:
Online Access:http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2021.01.011
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Once the reservoir is destroyed,it will bring huge damage to peoples lives and regional economic development.This paper extracts the topographic information of the upstream and downstream of Baihuatan Hydropower Station by Google Earth and Arc-GIS,establishes a numerical analysis model of the river channel through HEC-RAS based on the 1∶1 000 topographic map of the hub,calculates and analyzes the evolution process and the scope of impact of dam-break flood under nine schemes,and clearly defines the submerged scope and transfer route.The results show that:The flow of the breach depends on the width of the breach.During the course of the dam-break flood,with the continuation of the flood into the reservoir,the peak flow of the downstream sections decreases slightly;The greater the flood into the reservoir is,the earlier the peak flow of downstream sections occurs;Guoyushe,Shihua Village,Caiyuanzi,and Anning Village will be flooded to a certain extent.The analysis results provide a scientific basis for the safe operation of power stations and emergency management of flood control,and a reference for the research of similar gate dam projects.
ISSN:1001-9235