Risk Assessment of Small-Diameter Shield Construction in a Deep Drainage Tunnel Based on an ISM–CRITIC–Cloud Model
The deep drainage tunnel project is an important measure to alleviate urban waterlogging. The construction of a deep drainage tunnel is a complicated process, involving many influencing factors, and there are correlations among these influencing factors, so the risk assessment is difficult. In this...
Saved in:
Main Authors: | Kai Hu, Junwu Wang, Danhong Wu, Yingang Wang |
---|---|
Format: | Article |
Language: | English |
Published: |
MDPI AG
2024-12-01
|
Series: | Buildings |
Subjects: | |
Online Access: | https://www.mdpi.com/2075-5309/14/12/3920 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Deformation and Reinforcement of the Existing Tunnel Affected by New Shield Tunnel Construction with Small Clearance
by: Junchao Zhang, et al.
Published: (2025-01-01) -
Physical and mechanical response of large-diameter shield tunnel lining structure under non-uniform fire: A full-scale fire test-based study
by: Da-Long Jin, et al.
Published: (2025-02-01) -
Machine learning-based forecasting of ground surface settlement induced by metro shield tunneling construction
by: Qiankun Wang, et al.
Published: (2024-12-01) -
Protection Measures for Shield Tunneling Closely Under-passing Operating Metro Tunnels in Water-rich Soft Soil Area
by: MA Xifeng, et al.
Published: (2025-01-01) -
Comprehensive Construction Method for Shield Receiving in Water-rich Silty Sand Stratum
by: CHEN Yubing, et al.
Published: (2024-12-01)