Heng-yong, P., Jian-cheng, D., Xiao-ming, H., & Ding, H. Stability Anlalysis for the Accumulation Body with High Slope on the Left Bank in Front of Xiaowan Dam. Editorial Office of Pearl River.
Chicago Style (17th ed.) CitationHeng-yong, PAN, DU Jian-cheng, HU Xiao-ming, and HU Ding. Stability Anlalysis for the Accumulation Body with High Slope on the Left Bank in Front of Xiaowan Dam. Editorial Office of Pearl River.
MLA (9th ed.) CitationHeng-yong, PAN, et al. Stability Anlalysis for the Accumulation Body with High Slope on the Left Bank in Front of Xiaowan Dam. Editorial Office of Pearl River.
Warning: These citations may not always be 100% accurate.