Quality Grading Evaluation of Overhead Insulated Wire Considering Specific Testing Conditions
It is important to use material sampling to evaluate the quality of power equipment. In the equipment testing report, the simple judgement of qualified or unqualified is given to each testing index, which leads to the waste of a large number of testing data. In order to make more in-depth use of tes...
Saved in:
| Main Authors: | XU Kan, YUAN Zhiwen, ZHANG Jinli, WANG Weitao |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Harbin University of Science and Technology Publications
2024-04-01
|
| Series: | Journal of Harbin University of Science and Technology |
| Subjects: | |
| Online Access: | https://hlgxb.hrbust.edu.cn/#/digest?ArticleID=2321 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
REGIMES OF 110—330 KV SINGLE-CIRCUIT OVERHEAD TRANSMISSION LINES WITH REDUNDANT PHASE
by: Dmitry Sergeyevich Levin
Published: (2013-03-01) -
Model of Spring Liquid-Gas Tension Compensator of Overhead Catenary Wires and Messenger Cables
by: R. F. Nasretdinov
Published: (2015-02-01) -
On the Expediency of Laying Cable Power Lines with a Voltage of 6–35 kV Outside Settlements Instead of Overhead Power Lines
by: M. A. Korotkevich, et al.
Published: (2022-10-01) -
Performance Evaluation Model of Overhead Transmission Line Anti-Icing Strategies Considering Time Evolution
by: Xuyang Li, et al.
Published: (2025-07-01) -
Measuring Overhead of Concurrency and Virtual Memory
by: Yauhen Klimiankou
Published: (2018-04-01)