Study on the Universal Tapered Segmental Ring Assembly Simulation Algorithm and Deviation Assessment: A Case Study on Metro Line Tunnel
Universal tapered segmental ring system has been adopted to assemble tangent and curve line elements into the shield tunnels through the relative rotation of the adjacent front and rear rings, which simplifies the formwork design, demonstrates strong universality, and is easy for quality assurance....
Saved in:
| Main Authors: | Guoping Zheng, Jurij Karlovsek |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Wiley
2021-01-01
|
| Series: | Advances in Civil Engineering |
| Online Access: | http://dx.doi.org/10.1155/2021/9975848 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Full-Scale Full-Ring Experimental Study on Shield Tunnel Lining Structure with Innovative Segment Joints
by: ZHAO Mingying, et al.
Published: (2025-05-01) -
Settlement Behaviors of Metro Tunnels during the Metro Operation
by: Wenbo Shi, et al.
Published: (2015-01-01) -
Risk Analysis and Reducing Measures in the Tunneling Project of Tabriz Metro Line 2
by: Mohammad Darbor, et al.
Published: (2025-06-01) -
Modelling progressive failure of segmental linings in shield tunnels
by: Tianqi Zhang, et al.
Published: (2025-08-01) -
Research on identification algorithm of oscillating current in DC incoming lines of metro
by: WANG Nanqing, et al.
Published: (2024-03-01)