Response Analysis of Dam Heel and Gallery Arch before and after Backfilling and Water Filling of High Dam
As the key to the construction of high dams,backfilling in front of the dam and filling of the foundation pit have an important impact on the stress state of key parts of the dam body,such as the dam heel and gallery arch.Therefore,this paper studies the response of dam heel and gallery arch before...
Saved in:
Main Authors: | FU Yuchen, HU Yu, TAN Raosheng, ZHOU Mengxia, LIU Chunfeng, PEI Lei |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2021-01-01
|
Series: | Renmin Zhujiang |
Subjects: | |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2021.04.007 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Discussion on Application of Cardioid to Horizontal Arch Ring of Arch Dam
by: ZHOU Bin
Published: (2020-01-01) -
The Restoration of Paintings at the Beginning of the Nineteenth Century in the Imperial Gallery
by: Alice Hoppe-Harnoncourt
Published: (2012-04-01) -
Study on Structure Review of Emptying Bottom Outletfor Raising Water Retaining Level of Goupitan Arch Dam
by: WEI Wei, et al.
Published: (2020-01-01) -
Dynamic Model Test Based on Shaking Table of Wudongde High Arch Dam
by: XIONG Kun, et al.
Published: (2023-01-01) -
Particle image velocimetry analysis of the protective layer in embankment dams
by: Nisal Deelaka Halaba Arachchige Senarathna, et al.
Published: (2025-01-01)