Response Analysis of Dam Heel and Gallery Arch before and after Backfilling and Water Filling of High Dam
As the key to the construction of high dams,backfilling in front of the dam and filling of the foundation pit have an important impact on the stress state of key parts of the dam body,such as the dam heel and gallery arch.Therefore,this paper studies the response of dam heel and gallery arch before...
Saved in:
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2021-01-01
|
Series: | Renmin Zhujiang |
Subjects: | |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2021.04.007 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1841535721702162432 |
---|---|
author | FU Yuchen HU Yu TAN Raosheng ZHOU Mengxia LIU Chunfeng PEI Lei |
author_facet | FU Yuchen HU Yu TAN Raosheng ZHOU Mengxia LIU Chunfeng PEI Lei |
author_sort | FU Yuchen |
collection | DOAJ |
description | As the key to the construction of high dams,backfilling in front of the dam and filling of the foundation pit have an important impact on the stress state of key parts of the dam body,such as the dam heel and gallery arch.Therefore,this paper studies the response of dam heel and gallery arch before and after backfill and foundation pit filling of a high dam in Southwest China based on the monitoring data and simulation analysis.The results show that under the combined effect of weight,temperature and hydrostatic pressure,due to the influence of the backfill in front of the dam and the water filling height of the foundation pit,the tensile stress produces at the dam heel,and the compressive stress increases along the river at the gallery arch,with the maximum increment of 1.24 MPa.Thus,the tensile stress of the gallery arch is weakened and the stress state of the high dam is optimized,which can be further verified through the comparison with monitoring data. |
format | Article |
id | doaj-art-b12c33fd37ca4b638c4492db7abd1c6c |
institution | Kabale University |
issn | 1001-9235 |
language | zho |
publishDate | 2021-01-01 |
publisher | Editorial Office of Pearl River |
record_format | Article |
series | Renmin Zhujiang |
spelling | doaj-art-b12c33fd37ca4b638c4492db7abd1c6c2025-01-15T02:28:59ZzhoEditorial Office of Pearl RiverRenmin Zhujiang1001-92352021-01-014247647565Response Analysis of Dam Heel and Gallery Arch before and after Backfilling and Water Filling of High DamFU YuchenHU YuTAN RaoshengZHOU MengxiaLIU ChunfengPEI LeiAs the key to the construction of high dams,backfilling in front of the dam and filling of the foundation pit have an important impact on the stress state of key parts of the dam body,such as the dam heel and gallery arch.Therefore,this paper studies the response of dam heel and gallery arch before and after backfill and foundation pit filling of a high dam in Southwest China based on the monitoring data and simulation analysis.The results show that under the combined effect of weight,temperature and hydrostatic pressure,due to the influence of the backfill in front of the dam and the water filling height of the foundation pit,the tensile stress produces at the dam heel,and the compressive stress increases along the river at the gallery arch,with the maximum increment of 1.24 MPa.Thus,the tensile stress of the gallery arch is weakened and the stress state of the high dam is optimized,which can be further verified through the comparison with monitoring data.http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2021.04.007high damwater filling height of foundation pitstress analysisgallery steel bar metergallery archdam heel |
spellingShingle | FU Yuchen HU Yu TAN Raosheng ZHOU Mengxia LIU Chunfeng PEI Lei Response Analysis of Dam Heel and Gallery Arch before and after Backfilling and Water Filling of High Dam Renmin Zhujiang high dam water filling height of foundation pit stress analysis gallery steel bar meter gallery arch dam heel |
title | Response Analysis of Dam Heel and Gallery Arch before and after Backfilling and Water Filling of High Dam |
title_full | Response Analysis of Dam Heel and Gallery Arch before and after Backfilling and Water Filling of High Dam |
title_fullStr | Response Analysis of Dam Heel and Gallery Arch before and after Backfilling and Water Filling of High Dam |
title_full_unstemmed | Response Analysis of Dam Heel and Gallery Arch before and after Backfilling and Water Filling of High Dam |
title_short | Response Analysis of Dam Heel and Gallery Arch before and after Backfilling and Water Filling of High Dam |
title_sort | response analysis of dam heel and gallery arch before and after backfilling and water filling of high dam |
topic | high dam water filling height of foundation pit stress analysis gallery steel bar meter gallery arch dam heel |
url | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2021.04.007 |
work_keys_str_mv | AT fuyuchen responseanalysisofdamheelandgalleryarchbeforeandafterbackfillingandwaterfillingofhighdam AT huyu responseanalysisofdamheelandgalleryarchbeforeandafterbackfillingandwaterfillingofhighdam AT tanraosheng responseanalysisofdamheelandgalleryarchbeforeandafterbackfillingandwaterfillingofhighdam AT zhoumengxia responseanalysisofdamheelandgalleryarchbeforeandafterbackfillingandwaterfillingofhighdam AT liuchunfeng responseanalysisofdamheelandgalleryarchbeforeandafterbackfillingandwaterfillingofhighdam AT peilei responseanalysisofdamheelandgalleryarchbeforeandafterbackfillingandwaterfillingofhighdam |