Application and Research of Three-Row Pile Retaining Structure in Key Project of Drainage Pumping Station
Most of the wing walls at the connection section of forebays in key projects of drainage pumping stations are generally designed as cantilevers,buttresses,or box-type retaining wall structures and are equipped with temporary diversion and supporting measures,which thus require high project investmen...
Saved in:
Main Authors: | HU Xubao, YAN Yong |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2022-01-01
|
Series: | Renmin Zhujiang |
Subjects: | |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2022.12.019 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Application and Discussion of Intelligent Operation and Maintenance of BIM Visualization Platform for Drainage Pumping Stations
by: PENG Muzhan, et al.
Published: (2022-01-01) -
Optimization of Flow Characteristics and Diffusion Angles of Forward Inflow Forebay of Pumping Station
by: LI Yun, et al.
Published: (2025-01-01) -
Hydraulic Optimization of Inflow System of Bidirectional Drainage Pumping Station in Pump-sluice Complex Engineering
by: XIAO Zhiqiao, et al.
Published: (2024-06-01) -
Study on Weakening Model of Bearing Capacity of Rock-socketed Pile under Periodic Saturated Water and Drainage in Three Gorges Reservoir Area
by: LIU Mingwei, et al.
Published: (2021-01-01) -
Key technologies of personnel location’s management system for pumped storage power station
by: Na MA, et al.
Published: (2018-05-01)