Application and Research of Three-Row Pile Retaining Structure in Key Project of Drainage Pumping Station

Most of the wing walls at the connection section of forebays in key projects of drainage pumping stations are generally designed as cantilevers,buttresses,or box-type retaining wall structures and are equipped with temporary diversion and supporting measures,which thus require high project investmen...

Full description

Saved in:
Bibliographic Details
Main Authors: HU Xubao, YAN Yong
Format: Article
Language:zho
Published: Editorial Office of Pearl River 2022-01-01
Series:Renmin Zhujiang
Subjects:
Online Access:http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2022.12.019
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841535966513201152
author HU Xubao
YAN Yong
author_facet HU Xubao
YAN Yong
author_sort HU Xubao
collection DOAJ
description Most of the wing walls at the connection section of forebays in key projects of drainage pumping stations are generally designed as cantilevers,buttresses,or box-type retaining wall structures and are equipped with temporary diversion and supporting measures,which thus require high project investment and long construction period.This paper took the Yaquewei water conservancy project as an example and optimized the scheme of wing walls between the pump station and the sluice at the connection section of the forebay of a large-scale drainage pumping station.After comparison and selection,it was recommended to adopt a three-row pile retaining structure,which is less used in water conservancy projects.The optimized scheme saves the project investment and shortens the construction period.At the same time,three-dimensional finite element numerical simulation technology and other means were used to compare the calculation results with the measured engineering data,so as to demonstrate the technical feasibility of the scheme and summarize the design experience.
format Article
id doaj-art-b07fd8ff284644a7a38a554562cbd4a9
institution Kabale University
issn 1001-9235
language zho
publishDate 2022-01-01
publisher Editorial Office of Pearl River
record_format Article
series Renmin Zhujiang
spelling doaj-art-b07fd8ff284644a7a38a554562cbd4a92025-01-15T02:25:24ZzhoEditorial Office of Pearl RiverRenmin Zhujiang1001-92352022-01-014347640056Application and Research of Three-Row Pile Retaining Structure in Key Project of Drainage Pumping StationHU XubaoYAN YongMost of the wing walls at the connection section of forebays in key projects of drainage pumping stations are generally designed as cantilevers,buttresses,or box-type retaining wall structures and are equipped with temporary diversion and supporting measures,which thus require high project investment and long construction period.This paper took the Yaquewei water conservancy project as an example and optimized the scheme of wing walls between the pump station and the sluice at the connection section of the forebay of a large-scale drainage pumping station.After comparison and selection,it was recommended to adopt a three-row pile retaining structure,which is less used in water conservancy projects.The optimized scheme saves the project investment and shortens the construction period.At the same time,three-dimensional finite element numerical simulation technology and other means were used to compare the calculation results with the measured engineering data,so as to demonstrate the technical feasibility of the scheme and summarize the design experience.http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2022.12.019three-row pilesdrainage pumping stationfinite element numerical calculation
spellingShingle HU Xubao
YAN Yong
Application and Research of Three-Row Pile Retaining Structure in Key Project of Drainage Pumping Station
Renmin Zhujiang
three-row piles
drainage pumping station
finite element numerical calculation
title Application and Research of Three-Row Pile Retaining Structure in Key Project of Drainage Pumping Station
title_full Application and Research of Three-Row Pile Retaining Structure in Key Project of Drainage Pumping Station
title_fullStr Application and Research of Three-Row Pile Retaining Structure in Key Project of Drainage Pumping Station
title_full_unstemmed Application and Research of Three-Row Pile Retaining Structure in Key Project of Drainage Pumping Station
title_short Application and Research of Three-Row Pile Retaining Structure in Key Project of Drainage Pumping Station
title_sort application and research of three row pile retaining structure in key project of drainage pumping station
topic three-row piles
drainage pumping station
finite element numerical calculation
url http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2022.12.019
work_keys_str_mv AT huxubao applicationandresearchofthreerowpileretainingstructureinkeyprojectofdrainagepumpingstation
AT yanyong applicationandresearchofthreerowpileretainingstructureinkeyprojectofdrainagepumpingstation