Hydraulic Investigations of Capacity and Integration of Freshet Spillway Polls at the Hydraulic Unit of the Minsk Thermal Power Station No. 2

Hydraulic investigations of capacity and integration of freshet spillway pools at the hydraulic unit of the Minsk Thermal Power Station No.2 have been carried out in one of its span where a small hydroelectric power station will be erected. The maximal mark of the surcharged reservoir headwater leve...

Full description

Saved in:
Bibliographic Details
Main Authors: G. G. Kruglov, N. M. Kuntsevich, N. N. Linkevich
Format: Article
Language:Russian
Published: Belarusian National Technical University 2005-02-01
Series:Наука и техника
Online Access:https://sat.bntu.by/jour/article/view/1291
Tags: Add Tag
No Tags, Be the first to tag this record!
Description
Summary:Hydraulic investigations of capacity and integration of freshet spillway pools at the hydraulic unit of the Minsk Thermal Power Station No.2 have been carried out in one of its span where a small hydroelectric power station will be erected. The maximal mark of the surcharged reservoir headwater level has been determined while passing a catastrophic freshet.
ISSN:2227-1031
2414-0392