Data Communication Subsystem Reliability Optimization Scheme of Upgraded Shanghai Rail Transit Line 3 and Line 4

Objective During the evolution of existing DCS (data communication subsystem) towards a dual-mode four-network system in the major signaling system renovation project of Shanghai Rail Transit Line 3 and Line 4, there is a hidden risk that the trackside DCS single-point fault may cause the failure of...

Full description

Saved in:
Bibliographic Details
Main Author: WANG Xin
Format: Article
Language:zho
Published: Urban Mass Transit Magazine Press 2024-11-01
Series:Chengshi guidao jiaotong yanjiu
Subjects:
Online Access:https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.11.026.html
Tags: Add Tag
No Tags, Be the first to tag this record!