Data Communication Subsystem Reliability Optimization Scheme of Upgraded Shanghai Rail Transit Line 3 and Line 4
Objective During the evolution of existing DCS (data communication subsystem) towards a dual-mode four-network system in the major signaling system renovation project of Shanghai Rail Transit Line 3 and Line 4, there is a hidden risk that the trackside DCS single-point fault may cause the failure of...
Saved in:
| Main Author: | |
|---|---|
| Format: | Article |
| Language: | zho |
| Published: |
Urban Mass Transit Magazine Press
2024-11-01
|
| Series: | Chengshi guidao jiaotong yanjiu |
| Subjects: | |
| Online Access: | https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2024.11.026.html |
| Tags: |