Construction Technique of Tunnel Transiting Faulted Rupture Zone in Water Supply Project in the Eastern Shenzhen City
Saved in:
Main Author: | WANG Xiao-xing |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2006-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47667873&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Construction of Horseshoe Tunnel with Small Section for Shenzhen Eastern Water Supply Project
by: WANG Zhao-li, et al.
Published: (2001-01-01) -
Construction of Tunnelling in Tender Section Ⅲ of East Shenzhen Water Supply Source Project
by: 肖华, et al.
Published: (2002-01-01) -
Technical Problems of Tunneling of Water Diversion Project in East Shenzhen
by: 田安建
Published: (2001-01-01) -
Study on Method of Water Supply Quantity Distribution of Shenzhen City
by: 缪翚
Published: (2003-01-01) -
Technique of Construction of F7 Hole in Fault Zone in Spillway Tunnel in Xiaowan Hydroelectricity Station
by: LI Wei, et al.
Published: (2009-01-01)