Dual-objective optimization of prefabricated component logistics based on JIT strategy
Abstract Prefabricated construction involves manufacturing components in a factory and then transporting them to a construction site for assembly, yielding resource savings and improved efficiency. However, the large size and weight of prefabricated components, along with strict delivery requirement...
Saved in:
| Main Authors: | Chunli Zhang, Jianbo Jiang, Chaoming Xia, Yan Fu, Jun Liu, Peng Duan |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Nature Portfolio
2024-12-01
|
| Series: | Scientific Reports |
| Subjects: | |
| Online Access: | https://doi.org/10.1038/s41598-024-82689-w |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Comprehensive Benefit Evaluation for Prefabricated Buildings Based on NSGA-II and Simulated Annealing Optimization Projection Pursuit Method
by: Fang Wang, et al.
Published: (2024-01-01) -
Performance Comparison of JIT and JET Protocols on the OBS Networks
by: Alaa Jamal Abd, et al.
Published: (2022-12-01) -
Bi-level programming subsidy design for promoting sustainable prefabricated product logistics
by: Wen Yi, et al.
Published: (2021-10-01) -
Integrated Scheduling Optimization for Multi-Line Production and Transportation of Prefabricated Components Considering Shared Resources
by: Yiran Dan, et al.
Published: (2025-01-01) -
Multi-Objective Scheduling Optimization of Prefabricated Components Production Using Improved Non-Dominated Sorting Generic Algorithm II
by: Yishi Zhao, et al.
Published: (2025-02-01)