Construction of Vibro-Pile in Machine-electric Equipment Warehouse in Jinghong Hydropower Station
Saved in:
Main Authors: | JI Hong-ke, ZHANG Shi-yong |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2010-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47659113&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Spatio-temporal Variation Characteristics and Influencing Factors of Bank Collapse in Reservoir Area of Jinghong Hydropower Station
by: LIANG Ruifeng, et al.
Published: (2020-01-01) -
Application of Vibro Replacement Stone Piles in The Engineering of Haizhu Lake
by: Tan Wen-biao
Published: (2013-01-01) -
Construction Design of the Honghua Hydropower Station
by: ZHANG Song-feng
Published: (2006-01-01) -
Vibro-isolation suspension with quasi-zero stiffness for vibroactive equipment
by: Yu. A. Burian, et al.
Published: (2019-12-01) -
Repeat of Construction Surveying Control Network for Dapu Hydropower Station
by: LIU Shi-ping
Published: (2005-01-01)