Application of Breast Wall Pile to Zhongshan Drainage Pumping Station Excavation
Saved in:
Main Authors: | LI Ge, TANG Jun |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2007-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47663701&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Application of Pile Support in Expansion Project of Dakengkou Drainage Pump Station
by: 顾雪永, et al.
Published: (2004-01-01) -
Application and Research of Three-Row Pile Retaining Structure in Key Project of Drainage Pumping Station
by: HU Xubao, et al.
Published: (2022-01-01) -
Design of Application System of Correlation Pattern of Flood and Tide Water Level in Zhongshan Hydrometric Station
by: Lu Jing-de, et al.
Published: (2009-01-01) -
Application and Discussion of Intelligent Operation and Maintenance of BIM Visualization Platform for Drainage Pumping Stations
by: PENG Muzhan, et al.
Published: (2022-01-01) -
Measurement report: Analysis of aerosol optical depth variation at Zhongshan Station in Antarctica
by: L. Chen, et al.
Published: (2025-01-01)