Temperature Control of Dam Concrete during Construction in Summer for Yingnahe Reservoir Expansion Project
Saved in:
Main Authors: | 黄堰江, 麻王斌, 李亮 |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2004-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47669328&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Design and Execvtion of Foundation Excavation Scheme for Extention Project of Yingnahe Reservoir
by: 李亮, et al.
Published: (2002-01-01) -
Construction of Yingnahe Reservoir Expansion Project with Treating the New Dam Surface in Combination with the Old One
by: LU Ke-fa
Published: (2005-01-01) -
Application of Draw Plate in Extension Project of Yingnahe Reservoir
by: LU Ke-fa
Published: (2005-01-01) -
Application of Distorted Concrete in the Construction of Baise Project's Main Dam
by: ZHANG Zheng-guo, et al.
Published: (2006-01-01) -
Cause Analysis of Roller Compacted Concrete Corrosion in Dam of Xiaoyangxi Reservoir
by: CHEN Wen-bin, et al.
Published: (2009-01-01)