Integrating Tier-1 module suppliers in car sequencing problem
The objective of this study is to develop a car assembly sequence that is mutually agreed between car manufacturers and Tier-1 module suppliers such that overall modular supply chain efficiency is improved. In the literature so far, only constraints of car manufacturers have been considered in the c...
Saved in:
Main Author: | |
---|---|
Format: | Article |
Language: | English |
Published: |
Universitat Politècnica de València
2021-07-01
|
Series: | International Journal of Production Management and Engineering |
Subjects: | |
Online Access: | https://polipapers.upv.es/index.php/IJPME/article/view/14985 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1846095881075425280 |
---|---|
author | Emrae Jung |
author_facet | Emrae Jung |
author_sort | Emrae Jung |
collection | DOAJ |
description | The objective of this study is to develop a car assembly sequence that is mutually agreed between car manufacturers and Tier-1 module suppliers such that overall modular supply chain efficiency is improved. In the literature so far, only constraints of car manufacturers have been considered in the car sequencing problem. However, an assembly sequence from car manufacturer imposes a module assembly sequence on Tier-1 module suppliers since their assembly activities are synchronous and in sequence with assembly line of that car manufacturer. An imposed assembly sequence defines a certain demand rate for Tier-1 module suppliers and has significant impacts on operational cost of these suppliers which ultimately affects the overall modular supply chain efficiency. In this paper, a heuristic approach has been introduced to generate a supplier cognizant car sequence which does not only provide better operational conditions for Tier-1 module suppliers, but also satisfies constraints of the car manufacturer. |
format | Article |
id | doaj-art-a54972d4e13e49549f7d6f6b15c1d5a9 |
institution | Kabale University |
issn | 2340-4876 |
language | English |
publishDate | 2021-07-01 |
publisher | Universitat Politècnica de València |
record_format | Article |
series | International Journal of Production Management and Engineering |
spelling | doaj-art-a54972d4e13e49549f7d6f6b15c1d5a92025-01-02T08:56:07ZengUniversitat Politècnica de ValènciaInternational Journal of Production Management and Engineering2340-48762021-07-019211312310.4995/ijpme.2021.149858845Integrating Tier-1 module suppliers in car sequencing problemEmrae Jung0HBPO GmbHThe objective of this study is to develop a car assembly sequence that is mutually agreed between car manufacturers and Tier-1 module suppliers such that overall modular supply chain efficiency is improved. In the literature so far, only constraints of car manufacturers have been considered in the car sequencing problem. However, an assembly sequence from car manufacturer imposes a module assembly sequence on Tier-1 module suppliers since their assembly activities are synchronous and in sequence with assembly line of that car manufacturer. An imposed assembly sequence defines a certain demand rate for Tier-1 module suppliers and has significant impacts on operational cost of these suppliers which ultimately affects the overall modular supply chain efficiency. In this paper, a heuristic approach has been introduced to generate a supplier cognizant car sequence which does not only provide better operational conditions for Tier-1 module suppliers, but also satisfies constraints of the car manufacturer.https://polipapers.upv.es/index.php/IJPME/article/view/14985car sequencingmodule assemblysynchronous assembly |
spellingShingle | Emrae Jung Integrating Tier-1 module suppliers in car sequencing problem International Journal of Production Management and Engineering car sequencing module assembly synchronous assembly |
title | Integrating Tier-1 module suppliers in car sequencing problem |
title_full | Integrating Tier-1 module suppliers in car sequencing problem |
title_fullStr | Integrating Tier-1 module suppliers in car sequencing problem |
title_full_unstemmed | Integrating Tier-1 module suppliers in car sequencing problem |
title_short | Integrating Tier-1 module suppliers in car sequencing problem |
title_sort | integrating tier 1 module suppliers in car sequencing problem |
topic | car sequencing module assembly synchronous assembly |
url | https://polipapers.upv.es/index.php/IJPME/article/view/14985 |
work_keys_str_mv | AT emraejung integratingtier1modulesuppliersincarsequencingproblem |