APA (7th ed.) Citation

Yang, W. Optimization of Construction Schemes for Excavation of Main Tunnel of Draft Tube of Baise Project. Editorial Office of Pearl River.

Chicago Style (17th ed.) Citation

Yang, WANG. Optimization of Construction Schemes for Excavation of Main Tunnel of Draft Tube of Baise Project. Editorial Office of Pearl River.

MLA (9th ed.) Citation

Yang, WANG. Optimization of Construction Schemes for Excavation of Main Tunnel of Draft Tube of Baise Project. Editorial Office of Pearl River.

Warning: These citations may not always be 100% accurate.