A Refined Short-term Scheduling Method Considering the Difference of Peak-shaving Performance of Hydropower Stations
The scale of regulated hydropower in the power grid and the demand for refined dispatch continue to expand.How to carry out refined peak-shaving considering the differences in the regulatory performance of different power stations,which makes thermal power run smoothly and reduces the depth of parti...
Saved in:
Main Authors: | HUANG Kui, CHENG Ruixiang, HU Jiaqiu, LI Xiangyang, ZHU Yunke, WU Xinyu |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2024-01-01
|
Series: | Renmin Zhujiang |
Subjects: | |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2024.01.014 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Short-term Optimal Scheduling Model for Hydropower Stations Considering Peak Shaving of Local and HVDC Receiving Power Grids
by: ZHOU Binbin, et al.
Published: (2024-01-01) -
Short-Term Optimal Scheduling Method of Cascade Hydropower Stations Based on Segmented Load Construction Strategy
by: LI Chonghao, et al.
Published: (2023-01-01) -
Review on the Method of Compensation Benefit Allocation for Cascade Hydropower Stations
by: LI Yinghai, et al.
Published: (2020-01-01) -
The Generation Load Aggregator Participates in the Electricity Purchase and Sale Strategy of the Electric Energy–Peak Shaving Market
by: Haonan Zhang, et al.
Published: (2025-01-01) -
A hydropower plant scheduling model considering the stochastic correlation between runoff and electricity prices
by: WU Ying, et al.
Published: (2025-01-01)