Evaluation of Flood Impact of Waterway Project Based on One-Dimensional Hydrodynamic Model ——A Case Study of 2000-ton Laibin-Guiping Waterway Project of Datengxia Gorge

A one-dimensional hydrodynamic model is used to accurately and systematically evaluate the flood impact of the 2000-ton waterway project with a total length of 193.876 km from Laibin to Guiping.The model is calibrated and validated,and the changes in the water level of the channel are observed.On th...

Full description

Saved in:
Bibliographic Details
Main Authors: XIE Tianyun, WEI Lusi, LI Yi, ZHOU Shunxuan, LIN Xinyi
Format: Article
Language:zho
Published: Editorial Office of Pearl River 2023-01-01
Series:Renmin Zhujiang
Subjects:
Online Access:http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.01.004
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841536040432566272
author XIE Tianyun
WEI Lusi
LI Yi
ZHOU Shunxuan
LIN Xinyi
author_facet XIE Tianyun
WEI Lusi
LI Yi
ZHOU Shunxuan
LIN Xinyi
author_sort XIE Tianyun
collection DOAJ
description A one-dimensional hydrodynamic model is used to accurately and systematically evaluate the flood impact of the 2000-ton waterway project with a total length of 193.876 km from Laibin to Guiping.The model is calibrated and validated,and the changes in the water level of the channel are observed.On this basis,this study analyzes and evaluates the impact of waterway regulation and construction on the channel flood discharge,hydrological station observation,bridge operation,water intake,and other aspects.The results show that the project implementation leads to a drop in the water level in the project section,which has an adverse effect on the water level observation scheme of the hydrological station.Hence,it is necessary to take corresponding remedial measures such as supplementary monitoring.Moreover,the result indicates that it has no adverse impact on bridges,water intakes,flood discharge and drainage,and irrigation.The assessment results can provide a rich and detailed basis for the approval and management of the water administration department.
format Article
id doaj-art-a2badce5c9674324a694b9de8f7791fc
institution Kabale University
issn 1001-9235
language zho
publishDate 2023-01-01
publisher Editorial Office of Pearl River
record_format Article
series Renmin Zhujiang
spelling doaj-art-a2badce5c9674324a694b9de8f7791fc2025-01-15T02:23:01ZzhoEditorial Office of Pearl RiverRenmin Zhujiang1001-92352023-01-014447640852Evaluation of Flood Impact of Waterway Project Based on One-Dimensional Hydrodynamic Model ——A Case Study of 2000-ton Laibin-Guiping Waterway Project of Datengxia GorgeXIE TianyunWEI LusiLI YiZHOU ShunxuanLIN XinyiA one-dimensional hydrodynamic model is used to accurately and systematically evaluate the flood impact of the 2000-ton waterway project with a total length of 193.876 km from Laibin to Guiping.The model is calibrated and validated,and the changes in the water level of the channel are observed.On this basis,this study analyzes and evaluates the impact of waterway regulation and construction on the channel flood discharge,hydrological station observation,bridge operation,water intake,and other aspects.The results show that the project implementation leads to a drop in the water level in the project section,which has an adverse effect on the water level observation scheme of the hydrological station.Hence,it is necessary to take corresponding remedial measures such as supplementary monitoring.Moreover,the result indicates that it has no adverse impact on bridges,water intakes,flood discharge and drainage,and irrigation.The assessment results can provide a rich and detailed basis for the approval and management of the water administration department.http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.01.004one-dimensional hydrodynamic modelLaibin-Guiping waterwayflood impact analysisDatengxia Gorge Water Conservancy Project
spellingShingle XIE Tianyun
WEI Lusi
LI Yi
ZHOU Shunxuan
LIN Xinyi
Evaluation of Flood Impact of Waterway Project Based on One-Dimensional Hydrodynamic Model ——A Case Study of 2000-ton Laibin-Guiping Waterway Project of Datengxia Gorge
Renmin Zhujiang
one-dimensional hydrodynamic model
Laibin-Guiping waterway
flood impact analysis
Datengxia Gorge Water Conservancy Project
title Evaluation of Flood Impact of Waterway Project Based on One-Dimensional Hydrodynamic Model ——A Case Study of 2000-ton Laibin-Guiping Waterway Project of Datengxia Gorge
title_full Evaluation of Flood Impact of Waterway Project Based on One-Dimensional Hydrodynamic Model ——A Case Study of 2000-ton Laibin-Guiping Waterway Project of Datengxia Gorge
title_fullStr Evaluation of Flood Impact of Waterway Project Based on One-Dimensional Hydrodynamic Model ——A Case Study of 2000-ton Laibin-Guiping Waterway Project of Datengxia Gorge
title_full_unstemmed Evaluation of Flood Impact of Waterway Project Based on One-Dimensional Hydrodynamic Model ——A Case Study of 2000-ton Laibin-Guiping Waterway Project of Datengxia Gorge
title_short Evaluation of Flood Impact of Waterway Project Based on One-Dimensional Hydrodynamic Model ——A Case Study of 2000-ton Laibin-Guiping Waterway Project of Datengxia Gorge
title_sort evaluation of flood impact of waterway project based on one dimensional hydrodynamic model a case study of 2000 ton laibin guiping waterway project of datengxia gorge
topic one-dimensional hydrodynamic model
Laibin-Guiping waterway
flood impact analysis
Datengxia Gorge Water Conservancy Project
url http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.01.004
work_keys_str_mv AT xietianyun evaluationoffloodimpactofwaterwayprojectbasedononedimensionalhydrodynamicmodelacasestudyof2000tonlaibinguipingwaterwayprojectofdatengxiagorge
AT weilusi evaluationoffloodimpactofwaterwayprojectbasedononedimensionalhydrodynamicmodelacasestudyof2000tonlaibinguipingwaterwayprojectofdatengxiagorge
AT liyi evaluationoffloodimpactofwaterwayprojectbasedononedimensionalhydrodynamicmodelacasestudyof2000tonlaibinguipingwaterwayprojectofdatengxiagorge
AT zhoushunxuan evaluationoffloodimpactofwaterwayprojectbasedononedimensionalhydrodynamicmodelacasestudyof2000tonlaibinguipingwaterwayprojectofdatengxiagorge
AT linxinyi evaluationoffloodimpactofwaterwayprojectbasedononedimensionalhydrodynamicmodelacasestudyof2000tonlaibinguipingwaterwayprojectofdatengxiagorge