Construction Practice of 50t Prestressed Anchor Bars in the Underground Powerhouse of Xiaolangdi Project
Saved in:
Main Authors: | 黄红万, 李胜春, 颜廷松 |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2004-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47668533&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Stress Analysis of Anchors for Loading Test of Rock Wall Beam of Baise Project s Underground Powerhouse
by: DUAN Yun-kun, et al.
Published: (2006-01-01) -
Research on Cumulative Damage Characteristics of Rock Anchor Beam Concrete Supporting Structure by Blasting Vibration of Underground Powerhouse
by: Sheng Wan, et al.
Published: (2021-01-01) -
Design of Hydraulic Hoists for Eccentric Trunnion Sector Gates of Xiaolangdi Project
by: TENG Xiang, et al.
Published: (2001-01-01) -
Approach to Stability Analysis for Surrounding Rock of Underground Powerhouse
by: LIU Yuan-xun, et al.
Published: (2005-01-01) -
Application of Prestressing Anchors to the Reinforcement Project for Original Flood Wall in Liuzhou
by: 黎冠旺, et al.
Published: (2002-01-01)