Performance of an operational shield tunnel due to construction of a large cross-sectional straight-walled arch tunnel above-crossing
Innovative strategies for managing deformation have been proposed based on insights from the Hohhot Urban Rail Transit's Line 2, where a large cross-sectional and straight-walled arch tunnel traverses the flank obliquely above and directly over an operational shield tunnel. These strategies inv...
Saved in:
Main Authors: | Xu Zhang, Haobin Qin, Youjun Xu, Hao Qu, Chuanping Chen |
---|---|
Format: | Article |
Language: | English |
Published: |
Elsevier
2024-12-01
|
Series: | Alexandria Engineering Journal |
Subjects: | |
Online Access: | http://www.sciencedirect.com/science/article/pii/S1110016824011074 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Case study of performance assessment of overlapping shield tunnels with a small curve radius
by: Xu Zhang, et al.
Published: (2024-12-01) -
Deformation and Reinforcement of the Existing Tunnel Affected by New Shield Tunnel Construction with Small Clearance
by: Junchao Zhang, et al.
Published: (2025-01-01) -
Analytical Solution for Surrounding Rock Pressure of Deep-Buried Four-Hole Closely Spaced Double-Arch Tunnel
by: Xianghao Sun, et al.
Published: (2025-01-01) -
Muck Improvement Technology for Connection Passage of Shield Tunneling Metro Tunnels in Coastal Areas
by: JIANG Peng, et al.
Published: (2025-01-01) -
Study on the Influence Characteristics of Excavation Face Instability of New Tunnels Orthogonally Crossing Existing Tunnels
by: Shaokun Ma, et al.
Published: (2024-11-01)