Research on Lean Planning and Optimization for Precast Component Production Based on Discrete Event Simulation
Component factories are experiencing the problems associated with lean production, especially the accuracy of production time prediction and the unnecessary waste in terms of time and resource utilization. In order to solve these problems, a discrete event simulation- (DES-) based lean planning and...
Saved in:
Main Authors: | Zhenmin Yuan, Yaning Qiao, Yaru Guo, Yaowu Wang, Chen Chen, Wenshun Wang |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2020-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2020/8814914 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Site Selection of Precast Concrete Component Factory Based on PCA and GIS
by: Shuqiang Wang, et al.
Published: (2022-01-01) -
Optimization of Flow Shop Scheduling in Precast Concrete Component Production via Mixed-Integer Linear Programming
by: Zhansheng Liu, et al.
Published: (2021-01-01) -
Application of Precast Concrete Products By Static Pressure to Certain Embankment Construction
by: WANG Yong-jian, et al.
Published: (2009-01-01) -
Analyzing the Diverging Diamond Interchange Using Discrete Event Simulation
by: Michael Anderson, et al.
Published: (2012-01-01) -
A discrete event simulation model of compressive creep for LDPE
by: Seyyed Saeed Vaezzadeh, et al.
Published: (2025-03-01)