Layout and Tests of Xixi Junction of the Chaozhou Water Supply Project
Saved in:
Main Authors: | HUANG Zhi-min, LUO An, CHEN Can-hui, LU Han-zhu |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2005-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47669011&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Optimization of Foundation Pit Support Scheme for Xixi Power House of Chaozhou Water Supply Project
by: 李奎炎
Published: (2003-01-01) -
Construction Supervision for Xixi Closure Works on Deep Soft Foundation for Chaozhou Water Supply Project
by: 符能江, et al.
Published: (2003-01-01) -
Quality Control of Construction Setting-out of Xixi Main Works of Chaozhou Water Supply Project
by: 沈清华
Published: (2004-01-01) -
Application of Reinforced Concrete Support to Deep Foundation Digging for Xixi Powerhouse in Chaozhou Water Supply Project
by: ZHAO Guo-qing
Published: (2008-01-01) -
Selection and Comparison of Support Schemes of Deep Excavation in Soft Foundation for Xixi Powerhouse of Chaozhou Water Supply Project
by: JIANG Hong-da
Published: (2005-01-01)