Checking the Quality of Backfill Clay Cutoff Wall of Cased Well with the Help of Instantaneous Rayleigh Wave Method
Saved in:
Main Authors: | 梁国钱, 刘超英, 孙伯永, 王文双 |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2002-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47671034&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Impact of In Situ Soil in Soil-Bentonite Cutoff Wall Backfill on Compressibility and Hydraulic Conductivity
by: Ridong Fan, et al.
Published: (2021-01-01) -
On Design of Engineering Physical Prospecting Scheme
by: 吴信民, et al.
Published: (2002-01-01) -
Embankment Cutoff Wall Construction with Complicated Conditions
by: WANG Yong-jian
Published: (2009-01-01) -
Application of Rotary Gunite Cutoff Wall in Deep Foundation Pit
by: 张义东, et al.
Published: (2005-01-01) -
Quality Control for Construction of Concrete Cutoff Wall of Dahe Reservoir
by: 朱存忠, et al.
Published: (2003-01-01)