An Examination of Optimization Techniques for Resolving Hydro Generation Scheduling Issues
Hydropower plants' optimal scheduling of energy (OSE) is a crucial component of electric power systems and is a topic of intense academic investigation. Compared to other sustainable power sources, hydropower has a negligible impact on the environment and society. The goal of the three-time pe...
Saved in:
| Main Authors: | Bassam Mohsin Atiyah, Anwar H. Hameed |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Sumerian Scriptum Synthesis Publisher
2024-12-01
|
| Series: | Edison Journal for Electrical and Electronics Engineering |
| Subjects: | |
| Online Access: | https://ejeee.sss-publisher.com/index.php/ejeee/article/view/23 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Long-Term Optimal Scheduling of Hydro-Photovoltaic Hybrid Systems Considering Short-Term Operation Performance
by: Wenlin Yuan, et al.
Published: (2024-10-01) -
A hydropower plant scheduling model considering the stochastic correlation between runoff and electricity prices
by: WU Ying, et al.
Published: (2025-01-01) -
Short-Term Optimal Scheduling Method of Cascade Hydropower Stations Based on Segmented Load Construction Strategy
by: LI Chonghao, et al.
Published: (2023-01-01) -
A Refined Short-term Scheduling Method Considering the Difference of Peak-shaving Performance of Hydropower Stations
by: HUANG Kui, et al.
Published: (2024-01-01) -
Research on Optimal Power Generation Scheduling for Reservoir in Multi-Tailed River Channels
by: ZHANG Yonghui, et al.
Published: (2025-01-01)