Optimization Design of the Second-phase Cofferdam Demolition of Datengxia Water Conservancy Project
The second-phase cofferdam demolition of the Datengxia Water Conservancy Project has large quantities,a tight construction period,and great difficulty.To optimize the demolition design,this paper optimizes the demolition range and elevation of upstream and downstream transverse cofferdams and longit...
Saved in:
Main Authors: | CHEN Guihua, LI Guangyi, SU Wenliang |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2023-01-01
|
Series: | Renmin Zhujiang |
Subjects: | |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2023.07.006 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Study on Structure and Seepage Control Safety of Second-Phase Cofferdam in Datengxia Water Conservancy Project
by: ZUO Yongzhen, et al.
Published: (2023-01-01) -
Application of Improved YOLOv5 Algorithm in UAV Patrol Inspection of Datengxia Water Conservancy Project
by: GUAN Jixiang, et al.
Published: (2023-01-01) -
Control Index for Water Regulation in Fish Breeding Season for Dongta Spawning Ground after Operation of Datengxia Gorge Water Conservancy Project
by: LIU Lishi, et al.
Published: (2022-01-01) -
Research and Application of the Hydraulic Connection Section in Nanmujiang River Fishway at Datengxia Water Conservancy Project
by: FAN Suixing, et al.
Published: (2022-01-01) -
Study on Application of Uneven Waste Slag in Secondary Dam of Qianjiang River at Datengxia Gorge Water Conservancy Project
by: FAN Suixing, et al.
Published: (2022-01-01)