Study on cracking mechanism and key parameters of roof in gob-side entry retaining by pre-split blasting roof in deep mine
Based on 7135 working face of Qidong Coal Mine, the cracking mechanism of pre-splitting of gob-side entry retaining by roof cutting and the key parameters of pre-splitting blasting are studied by means of theoretical analysis, numerical simulation, and on-site measurement. Under the same blasting co...
Saved in:
Main Authors: | Xiao Liu, Xueqiu He, Yuntao Liang, Xinzhu Hua, Chen Li |
---|---|
Format: | Article |
Language: | English |
Published: |
SAGE Publishing
2025-01-01
|
Series: | Energy Exploration & Exploitation |
Online Access: | https://doi.org/10.1177/01445987241269551 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Study on Stability Control of Retained Gob-Side Entry by Blasting Fracturing Roof Technology in Thick Immediate Roof
by: Jingang Guo, et al.
Published: (2021-01-01) -
Study on the Support System Mechanism of Entry Roof with Roof Cutting Pressure Releasing Gob-Side Entry Retaining Technology
by: Xingen Ma, et al.
Published: (2022-01-01) -
Three-Dimensional Physical Simulation and Control Technology of Roof Movement Characteristics in Non-Pillar Gob-Side Entry Retaining by Roof Cutting
by: Xinzhu Hua, et al.
Published: (2021-01-01) -
Application of Presplitting Blasting Technology in Surrounding Rock Control of Gob-Side Entry Retaining with Hard Roof: A Case Study
by: Shuang Gong, et al.
Published: (2021-01-01) -
Analysis of Strata Behavior Process Characteristics of Gob-Side Entry Retaining with Roof Cutting and Pressure Releasing Based on Composite Roof Structure
by: Manchao He, et al.
Published: (2019-01-01)