Resource Significant Cost and Time Models for Building Projects
Cost and time models have been developed for road and bridge projects using resource significance analysis, which is in turn based on the 80/20 rule. The work packages in these models are designed to relate to site operations. They serve as the basis for measurement, estimating, planning, valuation...
Saved in:
| Main Author: | Nabil Dmaidi |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
An-Najah National University
2003-10-01
|
| Series: | مجلة جامعة النجاح للأبحاث العلوم الطبيعية |
| Online Access: | https://journals.najah.edu/media/journals/full_texts/resource-significant-cost-and-time-models-building-projects.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Subject Review: The State of the Art in Integration of Cost and Time Models
by: Nabil Dmaidi
Published: (2003-03-01) -
Pricing and Controlling Construction Projects Using the Significant Philosophy
by: Nabil Dmaidi, et al.
Published: (2002-12-01) -
Sub-activity Time-Cost Trade-off Model of Building Structural Beam on the Projects in the North Aceh Region
by: Fachrurrazi Fachrurrazi, et al.
Published: (2019-08-01) -
Classifying and Coding Design and Construction Information
by: Nabil Dmaidi
Published: (2003-10-01) -
Robust Optimization for Time-Cost Tradeoff Problem in Construction Projects
by: Ming Li, et al.
Published: (2014-01-01)