Test and Development of Comprehensive Performance Test System for Shift Tower
In order to study the comprehensive performance of shift tower in the manual transmission,a performance test system for the shift tower is designed. The test system adopts the selection and shift motor to drive the shift tower to realize the operating function of the gear selection and shift. Accord...
Saved in:
Main Authors: | , , , , , |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Journal of Mechanical Transmission
2018-01-01
|
Series: | Jixie chuandong |
Subjects: | |
Online Access: | http://www.jxcd.net.cn/thesisDetails#10.16578/j.issn.1004.2539.2018.11.032 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
_version_ | 1841547504398630912 |
---|---|
author | Zhang Zhigang Zheng Yanjie Li Teng Xu Dong Hou Yabin Yin Sheng |
author_facet | Zhang Zhigang Zheng Yanjie Li Teng Xu Dong Hou Yabin Yin Sheng |
author_sort | Zhang Zhigang |
collection | DOAJ |
description | In order to study the comprehensive performance of shift tower in the manual transmission,a performance test system for the shift tower is designed. The test system adopts the selection and shift motor to drive the shift tower to realize the operating function of the gear selection and shift. According to the measurement and control requirements of the test system,the hardware and software of the measurement and control system are designed. Finally,taking the test system as the test platform,the performance test of the selection force-displacement characteristic and shift force-displacement characteristic of a certain shift mechanism are carried out. The test results show that the test system can really-time and accurately measure the performance parameters such as selection force,selection displacement,shift force and shift displacement,which provides experimental support for the research and development of the shift tower. |
format | Article |
id | doaj-art-8f25d21c7f78409f89796f047c3f2a76 |
institution | Kabale University |
issn | 1004-2539 |
language | zho |
publishDate | 2018-01-01 |
publisher | Editorial Office of Journal of Mechanical Transmission |
record_format | Article |
series | Jixie chuandong |
spelling | doaj-art-8f25d21c7f78409f89796f047c3f2a762025-01-10T14:39:49ZzhoEditorial Office of Journal of Mechanical TransmissionJixie chuandong1004-25392018-01-014216817229939409Test and Development of Comprehensive Performance Test System for Shift TowerZhang ZhigangZheng YanjieLi TengXu DongHou YabinYin ShengIn order to study the comprehensive performance of shift tower in the manual transmission,a performance test system for the shift tower is designed. The test system adopts the selection and shift motor to drive the shift tower to realize the operating function of the gear selection and shift. According to the measurement and control requirements of the test system,the hardware and software of the measurement and control system are designed. Finally,taking the test system as the test platform,the performance test of the selection force-displacement characteristic and shift force-displacement characteristic of a certain shift mechanism are carried out. The test results show that the test system can really-time and accurately measure the performance parameters such as selection force,selection displacement,shift force and shift displacement,which provides experimental support for the research and development of the shift tower.http://www.jxcd.net.cn/thesisDetails#10.16578/j.issn.1004.2539.2018.11.032Shift towerTest systemMeasurement and control systemPerformance test |
spellingShingle | Zhang Zhigang Zheng Yanjie Li Teng Xu Dong Hou Yabin Yin Sheng Test and Development of Comprehensive Performance Test System for Shift Tower Jixie chuandong Shift tower Test system Measurement and control system Performance test |
title | Test and Development of Comprehensive Performance Test System for Shift Tower |
title_full | Test and Development of Comprehensive Performance Test System for Shift Tower |
title_fullStr | Test and Development of Comprehensive Performance Test System for Shift Tower |
title_full_unstemmed | Test and Development of Comprehensive Performance Test System for Shift Tower |
title_short | Test and Development of Comprehensive Performance Test System for Shift Tower |
title_sort | test and development of comprehensive performance test system for shift tower |
topic | Shift tower Test system Measurement and control system Performance test |
url | http://www.jxcd.net.cn/thesisDetails#10.16578/j.issn.1004.2539.2018.11.032 |
work_keys_str_mv | AT zhangzhigang testanddevelopmentofcomprehensiveperformancetestsystemforshifttower AT zhengyanjie testanddevelopmentofcomprehensiveperformancetestsystemforshifttower AT liteng testanddevelopmentofcomprehensiveperformancetestsystemforshifttower AT xudong testanddevelopmentofcomprehensiveperformancetestsystemforshifttower AT houyabin testanddevelopmentofcomprehensiveperformancetestsystemforshifttower AT yinsheng testanddevelopmentofcomprehensiveperformancetestsystemforshifttower |