Research on the Manufacturing Process of Steel Bridge Piers for Suspended Monorail Transit

[Objective] Manufacturing accuracy of the steel bridge pier, which is an important part of the suspended monorail transit system, determines the erection and installation of track beams, thereby affecting the train smooth running. Therefore, it is necessary to conduct research on it. [Method] Based...

Full description

Saved in:
Bibliographic Details
Main Authors: YIN Guifang, GONG Wenqiang, CHEN Xiaoshan, KONG Haiyong, WEI Chao, ZHU Gang
Format: Article
Language:zho
Published: Urban Mass Transit Magazine Press 2025-01-01
Series:Chengshi guidao jiaotong yanjiu
Subjects:
Online Access:https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.01.045.html
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841543703912513536
author YIN Guifang
GONG Wenqiang
CHEN Xiaoshan
KONG Haiyong
WEI Chao
ZHU Gang
author_facet YIN Guifang
GONG Wenqiang
CHEN Xiaoshan
KONG Haiyong
WEI Chao
ZHU Gang
author_sort YIN Guifang
collection DOAJ
description [Objective] Manufacturing accuracy of the steel bridge pier, which is an important part of the suspended monorail transit system, determines the erection and installation of track beams, thereby affecting the train smooth running. Therefore, it is necessary to conduct research on it. [Method] Based on the Tourism Special Line Phase I Project, a supporting facility for Wuhan Optics Valley Ecological Corridor Tourism, the process research is conducted in response to the T-shaped structural characteristics of steel bridge piers for suspended monorail transit and combining the design requirements for the manufacturing accuracy of steel bridge piers. The difficulties in the manufacturing process of monorail steel bridge piers are analyzed, and the manufacturing schemes for the steel cap beams are compared and selected. Moreover, the manufacturing process and accuracy control methods of suspended monorail steel bridge piers are systematically expounded. [Result & Conclusion] Through the actual manufacturing of steel bridge piers and the on-site erection and installation of track beams, the distance between the lug plates of the steel cap beams (0-2 mm) and the distance from the cantilever center to the column central line (-2-2 mm) can be effectively controlled. After the overall assembly and formation of the steel bridge piers, the distance error between the line connecting the positioning point of the left cap beam pin axis to the center point at the steel column bottom, and the line connecting the positioning point of the right cap beam pin axis to the center point at the steel column bottom is ≤3 mm, and the elevation error between the center of the lug plate and the center of the column is ≤2 mm, meeting the requirements for the overall assembly and production of steel bridge piers, and realizing the control over the manufacturing accuracy of steel bridge piers.
format Article
id doaj-art-8b0a9b9c859f4e9f955ab713e3b77ed9
institution Kabale University
issn 1007-869X
language zho
publishDate 2025-01-01
publisher Urban Mass Transit Magazine Press
record_format Article
series Chengshi guidao jiaotong yanjiu
spelling doaj-art-8b0a9b9c859f4e9f955ab713e3b77ed92025-01-13T08:04:42ZzhoUrban Mass Transit Magazine PressChengshi guidao jiaotong yanjiu1007-869X2025-01-0128124925210.16037/j.1007-869x.2025.01.045Research on the Manufacturing Process of Steel Bridge Piers for Suspended Monorail TransitYIN Guifang0GONG Wenqiang1CHEN Xiaoshan2KONG Haiyong3WEI Chao4ZHU Gang5China Railway Heavy Machinery Co, Ltd, 430063, Wuhan, ChinaChina Railway Heavy Machinery Co, Ltd, 430063, Wuhan, ChinaChina Railway Heavy Machinery Co, Ltd, 430063, Wuhan, ChinaChina Railway Heavy Machinery Co, Ltd, 430063, Wuhan, ChinaChina Railway Heavy Machinery Co, Ltd, 430063, Wuhan, ChinaChina Railway Heavy Machinery Co, Ltd, 430063, Wuhan, China[Objective] Manufacturing accuracy of the steel bridge pier, which is an important part of the suspended monorail transit system, determines the erection and installation of track beams, thereby affecting the train smooth running. Therefore, it is necessary to conduct research on it. [Method] Based on the Tourism Special Line Phase I Project, a supporting facility for Wuhan Optics Valley Ecological Corridor Tourism, the process research is conducted in response to the T-shaped structural characteristics of steel bridge piers for suspended monorail transit and combining the design requirements for the manufacturing accuracy of steel bridge piers. The difficulties in the manufacturing process of monorail steel bridge piers are analyzed, and the manufacturing schemes for the steel cap beams are compared and selected. Moreover, the manufacturing process and accuracy control methods of suspended monorail steel bridge piers are systematically expounded. [Result & Conclusion] Through the actual manufacturing of steel bridge piers and the on-site erection and installation of track beams, the distance between the lug plates of the steel cap beams (0-2 mm) and the distance from the cantilever center to the column central line (-2-2 mm) can be effectively controlled. After the overall assembly and formation of the steel bridge piers, the distance error between the line connecting the positioning point of the left cap beam pin axis to the center point at the steel column bottom, and the line connecting the positioning point of the right cap beam pin axis to the center point at the steel column bottom is ≤3 mm, and the elevation error between the center of the lug plate and the center of the column is ≤2 mm, meeting the requirements for the overall assembly and production of steel bridge piers, and realizing the control over the manufacturing accuracy of steel bridge piers.https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.01.045.htmlsuspended monorail transitsteel bridge piermanufacturing process
spellingShingle YIN Guifang
GONG Wenqiang
CHEN Xiaoshan
KONG Haiyong
WEI Chao
ZHU Gang
Research on the Manufacturing Process of Steel Bridge Piers for Suspended Monorail Transit
Chengshi guidao jiaotong yanjiu
suspended monorail transit
steel bridge pier
manufacturing process
title Research on the Manufacturing Process of Steel Bridge Piers for Suspended Monorail Transit
title_full Research on the Manufacturing Process of Steel Bridge Piers for Suspended Monorail Transit
title_fullStr Research on the Manufacturing Process of Steel Bridge Piers for Suspended Monorail Transit
title_full_unstemmed Research on the Manufacturing Process of Steel Bridge Piers for Suspended Monorail Transit
title_short Research on the Manufacturing Process of Steel Bridge Piers for Suspended Monorail Transit
title_sort research on the manufacturing process of steel bridge piers for suspended monorail transit
topic suspended monorail transit
steel bridge pier
manufacturing process
url https://umt1998.tongji.edu.cn/journal/paper/doi/10.16037/j.1007-869x.2025.01.045.html
work_keys_str_mv AT yinguifang researchonthemanufacturingprocessofsteelbridgepiersforsuspendedmonorailtransit
AT gongwenqiang researchonthemanufacturingprocessofsteelbridgepiersforsuspendedmonorailtransit
AT chenxiaoshan researchonthemanufacturingprocessofsteelbridgepiersforsuspendedmonorailtransit
AT konghaiyong researchonthemanufacturingprocessofsteelbridgepiersforsuspendedmonorailtransit
AT weichao researchonthemanufacturingprocessofsteelbridgepiersforsuspendedmonorailtransit
AT zhugang researchonthemanufacturingprocessofsteelbridgepiersforsuspendedmonorailtransit