Identification of contractors claims in Turnkey projects according to FIDIC by the system dynamics method (Case study on the 7008 housing units building project in Ojeda, Venezuela)
In this study, contractor’s claim and its management in in turnkey contracts according to FIDIC has been discussed through library studies and surveys among experienced specialists in international civil projects and then this discussion has been developed with benefit of modeling the claim using sy...
Saved in:
| Main Authors: | Amir Momeni, Elham Rastar, Armin Monirabbasi |
|---|---|
| Format: | Article |
| Language: | fas |
| Published: |
Assist. Prof. Dr. Roohollah Taherkhani
2019-02-01
|
| Series: | مهندسی و مدیریت ساخت |
| Subjects: | |
| Online Access: | https://www.jecm.ir/article_103639_bdd16ef4b00dcd5ba905f88f582d4c03.pdf |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Management of contractor's claim in Turnkey projects according to FIDIC under termination and dissolution of contract
by: Amir Momeni, et al.
Published: (2019-02-01) -
A comparative study of the nature and scope of implementation of turnkey obligations in Iranian law and the model contract of the International Federation of Consulting Engineers (FIDIC)
by: Mohammad Norouzi, et al.
Published: (2024-12-01) -
Comparison of AIA and FIDIC Construction Contracts with an equivalent Egyptian contract
by: Khaled Al Bayomi, et al.
Published: (2022-06-01) -
FIDIC force majeure clause from the viewpoint of Serbian law
by: Stojković Sara
Published: (2023-01-01) -
Contemporary Methods of Resolving Disputes Arising from FIDI C Construction Contracts Between the Employer and Contractor
by: Odai Mohammad AlHeilat, et al.
Published: (2024-09-01)