Application of Rotary Gunite Wall in Foundation Pit Built in Reclaimed Ground
Saved in:
Main Authors: | WANG Sheng-zhong, ZHANG Zhen, LI He-shan |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2005-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47669922&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Application of Rotary Gunite Cutoff Wall in Deep Foundation Pit
by: 张义东, et al.
Published: (2005-01-01) -
Application of Rotary Gunite Wall in Sheet Pile Cofferdam of a Certain Ship Yard
by: 张震, et al.
Published: (2005-01-01) -
Application of Deep Stirred Pile in Combination with High Gunite in Cutoff Wall
by: HUANG Wei-yan
Published: (2005-01-01) -
Application of High- pressure Gunite against Seepage with New Two-Tube Method in Wanghe Underground Reservoir
by: WAN Zhao-hua, et al.
Published: (2005-01-01) -
DYNAMIC ANALYSIS AND SIMULATION OF FULL ROTARY BUILT-IN STEERING DRILLING TOOLS
by: ZHANG GuangWei, et al.
Published: (2020-01-01)