Discussion on several problems in the construction of joint drilling geological section surveys

Based on "Surveying and prospecting of active fault GB/T36072-2018", "Active fault survey—drilling DB/T 92-2022" and other current standards, the basic requirements and main problems in the construction of joint drilling geological section surveys across hidden active faults are...

Full description

Saved in:
Bibliographic Details
Main Author: Weimin He
Format: Article
Language:zho
Published: Editorial Office of Reviews of Geophysics and Planetary Physics 2025-03-01
Series:地球与行星物理论评
Subjects:
Online Access:https://www.sjdz.org.cn/en/article/doi/10.19975/j.dqyxx.2024-039
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1846166835058180096
author Weimin He
author_facet Weimin He
author_sort Weimin He
collection DOAJ
description Based on "Surveying and prospecting of active fault GB/T36072-2018", "Active fault survey—drilling DB/T 92-2022" and other current standards, the basic requirements and main problems in the construction of joint drilling geological section surveys across hidden active faults are discussed. The current technical standard has the following problems: (1) the requirement of core recovery rate is low; and (2) low requirements for drilling depth and distance between boreholes across the hidden reverse fault. The following improvement measures are put forward: (1) the core recovery rate of all kinds of rock and soil should be greater than the value required by the current technical standards and the core recovery rate of clay should not be less than 99%; (2) the drilling across the hidden reverse fault should be deeper than the depth required by the current technical standards; when the thickness of the Quaternary system is thin, the drilling located in the hanging wall of the reverse fault near the uppermost point should continue to drill after drilling into the pre-Quaternary system in the hanging wall, and the drilling should reach the depth that can expose the pre-Quaternary system in the footwall; (3) when the fault displacement of the hidden reverse fault in the Quaternary system is small, the distance between the two adjacent boreholes on both sides of the uppermost point of the reverse fault needs to be 1-3 m or even smaller. The drilling layout method and the method of determining the occurrence of hidden faults in the joint drilling geological section surveys are added. Some uncertain factors in fault identification of joint drilling geological section surveys are analyzed, and corresponding countermeasures are proposed. It is also pointed out that the construction of joint drilling geological section survey is an information construction based on dynamic design, and the on-site technical director and their construction site technical management play an important role in the joint drilling geological section surveys.
format Article
id doaj-art-86e97529802a44eeb455963e2a31e1e0
institution Kabale University
issn 2097-1893
language zho
publishDate 2025-03-01
publisher Editorial Office of Reviews of Geophysics and Planetary Physics
record_format Article
series 地球与行星物理论评
spelling doaj-art-86e97529802a44eeb455963e2a31e1e02024-11-15T09:48:52ZzhoEditorial Office of Reviews of Geophysics and Planetary Physics地球与行星物理论评2097-18932025-03-0156215716610.19975/j.dqyxx.2024-0392024-039Discussion on several problems in the construction of joint drilling geological section surveysWeimin He0Geophysical Exploration Center, China Earthquake Administration, Zhengzhou 450002, ChinaBased on "Surveying and prospecting of active fault GB/T36072-2018", "Active fault survey—drilling DB/T 92-2022" and other current standards, the basic requirements and main problems in the construction of joint drilling geological section surveys across hidden active faults are discussed. The current technical standard has the following problems: (1) the requirement of core recovery rate is low; and (2) low requirements for drilling depth and distance between boreholes across the hidden reverse fault. The following improvement measures are put forward: (1) the core recovery rate of all kinds of rock and soil should be greater than the value required by the current technical standards and the core recovery rate of clay should not be less than 99%; (2) the drilling across the hidden reverse fault should be deeper than the depth required by the current technical standards; when the thickness of the Quaternary system is thin, the drilling located in the hanging wall of the reverse fault near the uppermost point should continue to drill after drilling into the pre-Quaternary system in the hanging wall, and the drilling should reach the depth that can expose the pre-Quaternary system in the footwall; (3) when the fault displacement of the hidden reverse fault in the Quaternary system is small, the distance between the two adjacent boreholes on both sides of the uppermost point of the reverse fault needs to be 1-3 m or even smaller. The drilling layout method and the method of determining the occurrence of hidden faults in the joint drilling geological section surveys are added. Some uncertain factors in fault identification of joint drilling geological section surveys are analyzed, and corresponding countermeasures are proposed. It is also pointed out that the construction of joint drilling geological section survey is an information construction based on dynamic design, and the on-site technical director and their construction site technical management play an important role in the joint drilling geological section surveys.https://www.sjdz.org.cn/en/article/doi/10.19975/j.dqyxx.2024-039active faultjoint drilling geologic sectionfault activity identificationuppermost point of a faultcore recovery rate
spellingShingle Weimin He
Discussion on several problems in the construction of joint drilling geological section surveys
地球与行星物理论评
active fault
joint drilling geologic section
fault activity identification
uppermost point of a fault
core recovery rate
title Discussion on several problems in the construction of joint drilling geological section surveys
title_full Discussion on several problems in the construction of joint drilling geological section surveys
title_fullStr Discussion on several problems in the construction of joint drilling geological section surveys
title_full_unstemmed Discussion on several problems in the construction of joint drilling geological section surveys
title_short Discussion on several problems in the construction of joint drilling geological section surveys
title_sort discussion on several problems in the construction of joint drilling geological section surveys
topic active fault
joint drilling geologic section
fault activity identification
uppermost point of a fault
core recovery rate
url https://www.sjdz.org.cn/en/article/doi/10.19975/j.dqyxx.2024-039
work_keys_str_mv AT weiminhe discussiononseveralproblemsintheconstructionofjointdrillinggeologicalsectionsurveys