Introduction of Design of Reef Demolition in Haitian Harbor Basin Dredging Project in Xiamen City
Saved in:
Main Author: | ZHONG Xiang-lan |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2010-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47661051&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Analysis of the Dredging Work Influence on the Siltation in Gaolan Area of Zhuhai Harbor
by: LIU Wei-dong, et al.
Published: (2007-01-01) -
Toward an ethnohistory of Haitian pilgrimage
by: Terry Rey
Published: (2005-01-01) -
Influence Study of Guangzhou Harbor Seagoing Waterway Dredging Work on the Hydrodynamic Situation and the River Stability of the Pearl River Mouth
by: LIU Jun-yong, et al.
Published: (2006-01-01) -
Application of Geological 3D Modelling in Reservoir Dredging Project
by: JIANG Xinhui, et al.
Published: (2023-01-01) -
Optimization Design of the Second-phase Cofferdam Demolition of Datengxia Water Conservancy Project
by: CHEN Guihua, et al.
Published: (2023-01-01)