Application of Distorted Concrete in the Construction of Baise Project's Main Dam
Saved in:
Main Authors: | ZHANG Zheng-guo, REN Yong-yi, WANG Hong-lang, HU Chun-bao |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2006-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47667499&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
RCC Main Dam of Baise Project under Construction
by: HE Shao-run
Published: (2006-01-01) -
Construction and Control of Earth Filling for Auxiliary Dam of Baise Project
by: WANG Lang, et al.
Published: (2006-01-01) -
Design of Auxiliary Dam of Baise Project
by: CHEN Gong-jian, et al.
Published: (2006-01-01) -
Application of Construction Technology with Diagonal Roller Compaction in RCC Main Dam Project
by: WU Xiu-rong, et al.
Published: (2006-01-01) -
Optimization of Construction Schemes for Excavation of Main Tunnel of Draft Tube of Baise Project
by: WANG Yang
Published: (2006-01-01)