Construction of Bag-filled Concrete Bank Revetment for Flood Improvement of Liuxi River
Saved in:
Main Author: | 雷衍波 |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2004-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47671633&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Construction Supervision of the Stage 4 Project of Flood Control Improvement of Liuxi River
by: HE Min
Published: (2005-01-01) -
Application of Geotextile Bag Filling Technique in Pearl River Estuary Improvement Project
by: 陈曙东, et al.
Published: (2002-01-01) -
Considerations of Ecologic Revetment Construction for River Tributaries in Guangzhou City
by: ZHENG Min
Published: (2005-01-01) -
Bank Revetment and Foundation Treatment of the South Embankment of Hanjiang River South_North Levee
by: 陈滇
Published: (2001-01-01) -
Design and Construction of Renault Cushion Revetment
by: LU Yue-hua, et al.
Published: (2010-01-01)