Construction Technology of Circumferrential Prestress without Bond for Zhangyang U-shape Thin-shell Flume
Saved in:
Main Authors: | 李春雨, 陈海新, 陈向日 |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2003-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47671203&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Development and Application of High-performance Concrete in Zhangyang Aqueduct Project
by: CHEN Shui-rong, et al.
Published: (2005-01-01) -
A Wave Energy Extraction System in Experimental Flume
by: Qin Guodong, et al.
Published: (2016-01-01) -
Numerical Simulation of Failure Behavior of Granular Debris Flows Based on Flume Model Tests
by: Jian Zhou, et al.
Published: (2013-01-01) -
Experience on Prestressed Pipe Pile Construction
by: 陈梅, et al.
Published: (2001-01-01) -
EM-Based Monitoring and Probabilistic Analysis of Prestress Loss of Bonded Tendons in PSC Beams
by: Zheheng Chen, et al.
Published: (2018-01-01)