Analysis of Accident of Inlet Gate of Unit 2 of Changhu Hydropower Station
Saved in:
Main Authors: | 苏全斌, 张剑 |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2002-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47672676&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A Hydropower Station Water Tunnel Brow-out Accident Calculation Analysis
by: CHEN Ke-zhen, et al.
Published: (2007-01-01) -
Characteristics of Miter Lock Gate Design in Honghua Hydropower Station
by: LU Wei
Published: (2006-01-01) -
Design of Working Plane Gate for Release Sluice of Honghua Hydropower Station
by: ZHANG Zu-lin
Published: (2005-01-01) -
Knowledge in Designing Hydropower Station with Tubular Bulb Units
by: 翁映标
Published: (2003-01-01) -
Structural Analysis of Buried Pipeline of Huanglongtan Hydropower Station
by: 苏凯, et al.
Published: (2003-01-01)