Application of GB Compound Rubber Water Proofing Strap to the Dongjiang-Shenzhen Water Supply Reconstruction Project
Saved in:
Main Authors: | LUO Ling-yun, SHEN Ming-liang |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2007-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47664844&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Prove into the Shape Selection of Water Delivery through Underground Pressure in Dongjiang-Shenzhen Water Supply Project.
by: 黄建添
Published: (2001-01-01) -
Probe into Model of Safety Assessment in Dongjiang River Water Source Project in Shenzhen
by: WANG Zhi-gang, et al.
Published: (2010-01-01) -
Introduction of Automatic Monitoring System for Source Water in Dongjiang River in Shenzhen
by: MIAO Hui, et al.
Published: (2008-01-01) -
Construction of Horseshoe Tunnel with Small Section for Shenzhen Eastern Water Supply Project
by: WANG Zhao-li, et al.
Published: (2001-01-01) -
Construction of Tunnelling in Tender Section Ⅲ of East Shenzhen Water Supply Source Project
by: 肖华, et al.
Published: (2002-01-01)