Research on Characteristics of Unloading Zone at Lower Dam Site of Banda Hydropower Station
In order to study the characteristics of unloading zone at the lower dam site of Bandahydropower station, this paper firstly introduces the mechanism of unloading and the researchbackground of unloading zone division, then according to the project profile and slope unloadingcondition in dam area, di...
Saved in:
Main Authors: | HE Shutao, DENG Hui, WU Xiaojun, XIAO Yuyue, SU Hang |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2020-01-01
|
Series: | Renmin Zhujiang |
Subjects: | |
Online Access: | http://www.renminzhujiang.cn/thesisDetails#10.3969/j.issn.1001-9235.2020.06.008 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Study on Physical Simulation Test of Unloading Mechanism of River Valley Down-cutting in a Hydropower Station
by: HE Shutao, et al.
Published: (2020-01-01) -
Experimental Study on Mechanical Properties of Daciteunder the Unloading Condition of a HydropowerStation
by: LI Wancai, et al.
Published: (2020-01-01) -
Macro-meso failure mechanism and strength criterion of frozen weakly cemented sandstone under triaxial unloading
by: Qinghai Deng, et al.
Published: (2025-01-01) -
Effects of inclination angle and unloading rate of confining pressure on triaxial unloading-induced slip behaviors of shale fractures
by: Zhe Yuan, et al.
Published: (2025-02-01) -
Research on Altered Rock at a Hydropower StationBased on Triaxial Unloading Test
by: LI Wancai, et al.
Published: (2020-01-01)