Belt conveyor tunnel support structure

This paper will cover the Preliminary Design of the by-products transport system after the Ecological reconstruction of the thermal power plant Pljevlja. The 4.5 km belt conveyor long route enters the tunnel at Borovica Lake. Tunnel position is in relation to the route, the cross-section selection,...

Full description

Saved in:
Bibliographic Details
Main Authors: Živanović Miloš, Miljković Nikola, Stefanović Jelena, Jovanović Nikola, Pavlović Zlatko
Format: Article
Language:srp
Published: Mining and Metallurgy Institute, Bor 2024-01-01
Series:Bakar
Subjects:
Online Access:https://scindeks-clanci.ceon.rs/data/pdf/0351-0212/2024/0351-02122402029Q.pdf
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1841554332698279936
author Živanović Miloš
Miljković Nikola
Stefanović Jelena
Jovanović Nikola
Pavlović Zlatko
author_facet Živanović Miloš
Miljković Nikola
Stefanović Jelena
Jovanović Nikola
Pavlović Zlatko
author_sort Živanović Miloš
collection DOAJ
description This paper will cover the Preliminary Design of the by-products transport system after the Ecological reconstruction of the thermal power plant Pljevlja. The 4.5 km belt conveyor long route enters the tunnel at Borovica Lake. Tunnel position is in relation to the route, the cross-section selection, calculation of structural elements and fitting into the ambient unit around the lake are described.
format Article
id doaj-art-774d78948dad468981a6398b53a9adda
institution Kabale University
issn 0351-0212
language srp
publishDate 2024-01-01
publisher Mining and Metallurgy Institute, Bor
record_format Article
series Bakar
spelling doaj-art-774d78948dad468981a6398b53a9adda2025-01-08T15:13:31ZsrpMining and Metallurgy Institute, BorBakar0351-02122024-01-01492293610.5937/bakar2402029Z0351-02122402029QBelt conveyor tunnel support structureŽivanović Miloš0https://orcid.org/0009-0006-3331-4294Miljković Nikola1https://orcid.org/0000-0001-6418-1814Stefanović Jelena2https://orcid.org/0000-0001-6418-1814Jovanović Nikola3https://orcid.org/0009-0008-0982-2576Pavlović Zlatko4https://orcid.org/0000-0001-8102-1820Institut za rudarstvo i metalurgiju, Bor, SerbiaInstitut za rudarstvo i metalurgiju, Bor, SerbiaInstitut za rudarstvo i metalurgiju, Bor, SerbiaInstitut za rudarstvo i metalurgiju, Bor, SerbiaInstitut za rudarstvo i metalurgiju, Bor, SerbiaThis paper will cover the Preliminary Design of the by-products transport system after the Ecological reconstruction of the thermal power plant Pljevlja. The 4.5 km belt conveyor long route enters the tunnel at Borovica Lake. Tunnel position is in relation to the route, the cross-section selection, calculation of structural elements and fitting into the ambient unit around the lake are described.https://scindeks-clanci.ceon.rs/data/pdf/0351-0212/2024/0351-02122402029Q.pdftunnelbelt conveyoršumanerouteby-products transport
spellingShingle Živanović Miloš
Miljković Nikola
Stefanović Jelena
Jovanović Nikola
Pavlović Zlatko
Belt conveyor tunnel support structure
Bakar
tunnel
belt conveyor
šumane
route
by-products transport
title Belt conveyor tunnel support structure
title_full Belt conveyor tunnel support structure
title_fullStr Belt conveyor tunnel support structure
title_full_unstemmed Belt conveyor tunnel support structure
title_short Belt conveyor tunnel support structure
title_sort belt conveyor tunnel support structure
topic tunnel
belt conveyor
šumane
route
by-products transport
url https://scindeks-clanci.ceon.rs/data/pdf/0351-0212/2024/0351-02122402029Q.pdf
work_keys_str_mv AT zivanovicmilos beltconveyortunnelsupportstructure
AT miljkovicnikola beltconveyortunnelsupportstructure
AT stefanovicjelena beltconveyortunnelsupportstructure
AT jovanovicnikola beltconveyortunnelsupportstructure
AT pavloviczlatko beltconveyortunnelsupportstructure