Optimization of Construction Design in Quota Design of Mengli Hydropower Station
Saved in:
Main Authors: | 张淑芳, 斯煊昀 |
---|---|
Format: | Article |
Language: | zho |
Published: |
Editorial Office of Pearl River
2004-01-01
|
Series: | Renmin Zhujiang |
Online Access: | http://www.renminzhujiang.cn/thesisDetails?columnId=47669712&Fpath=home&index=0 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Construction Design of the Honghua Hydropower Station
by: ZHANG Song-feng
Published: (2006-01-01) -
Design and Construction of Extension Project of Baishiyao Hydropower Station
by: SONG Man-yan, et al.
Published: (2005-01-01) -
Optimizing Design of Metallic Structure of Hoghua Hydropower Station
by: LI Zi-qiu
Published: (2005-01-01) -
Analysis Approach of the Convergence of the Rain Water and Flood Water in the Design of the Waterlogging Drainage in the Reservoir Area in the Mengli Hydroelectric Station
by: ZHANG Jian, et al.
Published: (2006-01-01) -
Layout of the Honghua Hydropower Station and the Optimized Design of the Relevant Buildings
by: LING Chun-hai
Published: (2007-01-01)