The Supplier Selection of Prefabricated Component Production Line: A Lean-Based AHP–Improved VIKOR Framework

Prefabrication is increasingly recognized as a sustainable construction practice, with the efficiency of prefabricated component (PC) production lines playing a critical role in its success. However, supplier selection for PC production lines has become more complex due to evolving industrial demand...

Full description

Saved in:
Bibliographic Details
Main Authors: Pei Dang, Hui Gao, Zhanwen Niu, Linna Geng, Felix Kin Peng Hui, Chao Sun
Format: Article
Language:English
Published: MDPI AG 2024-12-01
Series:Buildings
Subjects:
Online Access:https://www.mdpi.com/2075-5309/14/12/4018
Tags: Add Tag
No Tags, Be the first to tag this record!
_version_ 1846105427104759808
author Pei Dang
Hui Gao
Zhanwen Niu
Linna Geng
Felix Kin Peng Hui
Chao Sun
author_facet Pei Dang
Hui Gao
Zhanwen Niu
Linna Geng
Felix Kin Peng Hui
Chao Sun
author_sort Pei Dang
collection DOAJ
description Prefabrication is increasingly recognized as a sustainable construction practice, with the efficiency of prefabricated component (PC) production lines playing a critical role in its success. However, supplier selection for PC production lines has become more complex due to evolving industrial demands, uncertain supply chain conditions, and operational complexities. This study addresses this gap by developing a lean-based AHP–improved VIKOR decision-making framework to enhance the supplier selection for PC production lines. The framework integrates advanced lean principles with universal and specific evaluation criteria, identified through a comprehensive literature review and expert interviews. Its validity was tested via a real-world case study with Yizhong Construction Co., Ltd., Tianjin, China. The results show that the three suppliers are ranked as Zhongjian > Tianyi > Xindadi, where Zhongjian is the best supplier in this case study, with a VIKOR index of 0.156. The findings show that the developed framework can improve the supplier selection efficiency by aligning with lean principles and enhancing the performance of PC production lines. By addressing the challenges of PC supplier selection, this study provides a practical tool to advance the adoption of prefabrication in construction. Furthermore, it contributes to the development of the PC industry by offering a robust method for the selection of suitable suppliers, which can help to optimize the production efficiency and support sustainable practices in construction.
format Article
id doaj-art-73ca52f2bde34f08b04643c0ad6f8f06
institution Kabale University
issn 2075-5309
language English
publishDate 2024-12-01
publisher MDPI AG
record_format Article
series Buildings
spelling doaj-art-73ca52f2bde34f08b04643c0ad6f8f062024-12-27T14:16:03ZengMDPI AGBuildings2075-53092024-12-011412401810.3390/buildings14124018The Supplier Selection of Prefabricated Component Production Line: A Lean-Based AHP–Improved VIKOR FrameworkPei Dang0Hui Gao1Zhanwen Niu2Linna Geng3Felix Kin Peng Hui4Chao Sun5School of Economics and Management, Tianjin Chengjian University, Tianjin 300384, ChinaSchool of Civil Engineering, Liaoning Technical University, Fuxin 123000, ChinaCollege of Management and Economics, Tianjin University, Tianjin, 300072, ChinaCentre for Smart Modern Construction, School of Engineering, Design & Built Environment, Western Sydney University, Parramatta, NSW 2116, AustraliaDepartment of Infrastructure Engineering, The University of Melbourne, Parkville, VIC 3052, AustraliaSchool of Economics and Management, Tianjin Chengjian University, Tianjin 300384, ChinaPrefabrication is increasingly recognized as a sustainable construction practice, with the efficiency of prefabricated component (PC) production lines playing a critical role in its success. However, supplier selection for PC production lines has become more complex due to evolving industrial demands, uncertain supply chain conditions, and operational complexities. This study addresses this gap by developing a lean-based AHP–improved VIKOR decision-making framework to enhance the supplier selection for PC production lines. The framework integrates advanced lean principles with universal and specific evaluation criteria, identified through a comprehensive literature review and expert interviews. Its validity was tested via a real-world case study with Yizhong Construction Co., Ltd., Tianjin, China. The results show that the three suppliers are ranked as Zhongjian > Tianyi > Xindadi, where Zhongjian is the best supplier in this case study, with a VIKOR index of 0.156. The findings show that the developed framework can improve the supplier selection efficiency by aligning with lean principles and enhancing the performance of PC production lines. By addressing the challenges of PC supplier selection, this study provides a practical tool to advance the adoption of prefabrication in construction. Furthermore, it contributes to the development of the PC industry by offering a robust method for the selection of suitable suppliers, which can help to optimize the production efficiency and support sustainable practices in construction.https://www.mdpi.com/2075-5309/14/12/4018prefabricated components (PCs)supplier selectionVIKORlean principle
spellingShingle Pei Dang
Hui Gao
Zhanwen Niu
Linna Geng
Felix Kin Peng Hui
Chao Sun
The Supplier Selection of Prefabricated Component Production Line: A Lean-Based AHP–Improved VIKOR Framework
Buildings
prefabricated components (PCs)
supplier selection
VIKOR
lean principle
title The Supplier Selection of Prefabricated Component Production Line: A Lean-Based AHP–Improved VIKOR Framework
title_full The Supplier Selection of Prefabricated Component Production Line: A Lean-Based AHP–Improved VIKOR Framework
title_fullStr The Supplier Selection of Prefabricated Component Production Line: A Lean-Based AHP–Improved VIKOR Framework
title_full_unstemmed The Supplier Selection of Prefabricated Component Production Line: A Lean-Based AHP–Improved VIKOR Framework
title_short The Supplier Selection of Prefabricated Component Production Line: A Lean-Based AHP–Improved VIKOR Framework
title_sort supplier selection of prefabricated component production line a lean based ahp improved vikor framework
topic prefabricated components (PCs)
supplier selection
VIKOR
lean principle
url https://www.mdpi.com/2075-5309/14/12/4018
work_keys_str_mv AT peidang thesupplierselectionofprefabricatedcomponentproductionlinealeanbasedahpimprovedvikorframework
AT huigao thesupplierselectionofprefabricatedcomponentproductionlinealeanbasedahpimprovedvikorframework
AT zhanwenniu thesupplierselectionofprefabricatedcomponentproductionlinealeanbasedahpimprovedvikorframework
AT linnageng thesupplierselectionofprefabricatedcomponentproductionlinealeanbasedahpimprovedvikorframework
AT felixkinpenghui thesupplierselectionofprefabricatedcomponentproductionlinealeanbasedahpimprovedvikorframework
AT chaosun thesupplierselectionofprefabricatedcomponentproductionlinealeanbasedahpimprovedvikorframework
AT peidang supplierselectionofprefabricatedcomponentproductionlinealeanbasedahpimprovedvikorframework
AT huigao supplierselectionofprefabricatedcomponentproductionlinealeanbasedahpimprovedvikorframework
AT zhanwenniu supplierselectionofprefabricatedcomponentproductionlinealeanbasedahpimprovedvikorframework
AT linnageng supplierselectionofprefabricatedcomponentproductionlinealeanbasedahpimprovedvikorframework
AT felixkinpenghui supplierselectionofprefabricatedcomponentproductionlinealeanbasedahpimprovedvikorframework
AT chaosun supplierselectionofprefabricatedcomponentproductionlinealeanbasedahpimprovedvikorframework