5G SA converged charging project design and practice
There are some challenges of direct communication and converged charging in large SA network construction to be solved.A converged charging project based on SCP and customized CG was proposed, following by analysis of how to meet converged charging requirements of large operators.Technology details...
Saved in:
Main Authors: | Dongfeng MAO, Song JIANG, Qing WANG |
---|---|
Format: | Article |
Language: | zho |
Published: |
Beijing Xintong Media Co., Ltd
2022-05-01
|
Series: | Dianxin kexue |
Subjects: | |
Online Access: | http://www.telecomsci.com/zh/article/doi/10.11959/j.issn.1000-0801.2022114/ |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Architecture and key technologies of 5G converged charging system
by: Lei QI, et al.
Published: (2021-06-01) -
5G RAN sharing &co-construction scheme
by: Tao MA
Published: (2019-09-01) -
An approach of LTE measurement report based 2.1 GHz and 3.5 GHz 5G SA coverage evaluation
by: Jianxian LU, et al.
Published: (2022-06-01) -
Towards converged, intelligent, low-carbon characterized 5G-Advanced technologies
by: Xiaodong DUAN, et al.
Published: (2022-03-01) -
5G core network deployment and evolution scheme
by: Xu YANG, et al.
Published: (2020-09-01)