Trade-off between computation time and solution quality for integrated generation and transmission expansion planning with N-1 security criterion
The generation and transmission (G&T) expansion planning of large-scale systems is usually carried out hierarchically due to the high complexity of the problem. However, this hierarchical plan may be more expensive than a fully integrated (co-optimized) G&T plan that, on the other hand, requ...
Saved in:
| Main Authors: | Lucas Y. Okamura, Carmen L.T. Borges, Gianfranco Chicco |
|---|---|
| Format: | Article |
| Language: | English |
| Published: |
Elsevier
2025-03-01
|
| Series: | International Journal of Electrical Power & Energy Systems |
| Subjects: | |
| Online Access: | http://www.sciencedirect.com/science/article/pii/S0142061524006690 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
A mixed integer linear programming model for quarantine-based home healthcare scheduling under uncertainty
by: Najmeh Nabavizadeh, et al.
Published: (2024-12-01) -
AC Optimal Power Flow: a Conic Programming relaxation and an iterative MILP scheme for Global Optimization
by: Oustry, Antoine
Published: (2022-11-01) -
Cooperative Scheduling Strategy of Energy Storage Systems for Regional Grid Supplied by Renewable Energy
by: Rui MA, et al.
Published: (2021-02-01) -
Optimizing the Supply Chain for Recycling Electric Vehicle NMC Batteries
by: Fransisca Indraningsih Kasy, et al.
Published: (2025-01-01) -
A nationwide planning model for argon supply chains with coordinated production and distribution
by: Sergio M.S. Neiro, et al.
Published: (2025-03-01)