Using the booster pumping stations for modernization of heat supply system
The authors consider the problem of insufficient power of existing boiler houses and heat supply networks in large cities, which leads to overloads and accidents. Modernization of operation in heat supply system is aimed at improving energy efficiency, environmental safety and reliability of heat su...
Saved in:
| Main Authors: | , , , |
|---|---|
| Format: | Article |
| Language: | Russian |
| Published: |
Industrial University of Tyumen
2024-06-01
|
| Series: | Архитектура, строительство, транспорт |
| Subjects: | |
| Online Access: | https://ast.tyuiu.ru/jour/article/view/159 |
| Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
| _version_ | 1849239378335891456 |
|---|---|
| author | T. S. Zhilina M. N. Sabukevich Vu Dinh Dang Wijesundara Janaka |
| author_facet | T. S. Zhilina M. N. Sabukevich Vu Dinh Dang Wijesundara Janaka |
| author_sort | T. S. Zhilina |
| collection | DOAJ |
| description | The authors consider the problem of insufficient power of existing boiler houses and heat supply networks in large cities, which leads to overloads and accidents. Modernization of operation in heat supply system is aimed at improving energy efficiency, environmental safety and reliability of heat supply networks. The use of modern technologies provides a significant improvement in the operation of heat supply systems and makes the coolant more accessible and efficient for consumers. To ensure uninterrupted operation of heat supply facilities in residential areas and efficient operation of heat supply networks and heating mains in hard-to-reach areas with difficult terrain, the authors proposed to install or modernize booster pumping stations. Such stations help to keep the required parameters of the coolant and to provide heat consumers with quality coolant. The article discusses the operating principle of pumping stations and provides a functional diagram of process automation. Piezometric diagrams of pre- and post-installation of booster pumping stations allow us to speak about the positive effect of booster pumping stations modernization in the heat supply system. Thus, after reconstruction, the total capacity of pumping groups on the direct and return circuits increased by 1.33 times, the head in the system – by 1.12 times. |
| format | Article |
| id | doaj-art-6d4d4b9e662e4d34b30a6c4817598f95 |
| institution | Kabale University |
| issn | 2782-232X 2713-0770 |
| language | Russian |
| publishDate | 2024-06-01 |
| publisher | Industrial University of Tyumen |
| record_format | Article |
| series | Архитектура, строительство, транспорт |
| spelling | doaj-art-6d4d4b9e662e4d34b30a6c4817598f952025-08-20T04:01:01ZrusIndustrial University of TyumenАрхитектура, строительство, транспорт2782-232X2713-07702024-06-0102566610.31660/2782-232X-2024-2-56-66160Using the booster pumping stations for modernization of heat supply systemT. S. Zhilina0M. N. Sabukevich1Vu Dinh Dang2Wijesundara Janaka3Industrial University of TyumenIndustrial University of TyumenHanoi University of Mining and GeologyUniversity of MoratuwaThe authors consider the problem of insufficient power of existing boiler houses and heat supply networks in large cities, which leads to overloads and accidents. Modernization of operation in heat supply system is aimed at improving energy efficiency, environmental safety and reliability of heat supply networks. The use of modern technologies provides a significant improvement in the operation of heat supply systems and makes the coolant more accessible and efficient for consumers. To ensure uninterrupted operation of heat supply facilities in residential areas and efficient operation of heat supply networks and heating mains in hard-to-reach areas with difficult terrain, the authors proposed to install or modernize booster pumping stations. Such stations help to keep the required parameters of the coolant and to provide heat consumers with quality coolant. The article discusses the operating principle of pumping stations and provides a functional diagram of process automation. Piezometric diagrams of pre- and post-installation of booster pumping stations allow us to speak about the positive effect of booster pumping stations modernization in the heat supply system. Thus, after reconstruction, the total capacity of pumping groups on the direct and return circuits increased by 1.33 times, the head in the system – by 1.12 times.https://ast.tyuiu.ru/jour/article/view/159heat supply networkcoolantautomationenergy efficiencyenergy savingmodernization of heat supply system |
| spellingShingle | T. S. Zhilina M. N. Sabukevich Vu Dinh Dang Wijesundara Janaka Using the booster pumping stations for modernization of heat supply system Архитектура, строительство, транспорт heat supply network coolant automation energy efficiency energy saving modernization of heat supply system |
| title | Using the booster pumping stations for modernization of heat supply system |
| title_full | Using the booster pumping stations for modernization of heat supply system |
| title_fullStr | Using the booster pumping stations for modernization of heat supply system |
| title_full_unstemmed | Using the booster pumping stations for modernization of heat supply system |
| title_short | Using the booster pumping stations for modernization of heat supply system |
| title_sort | using the booster pumping stations for modernization of heat supply system |
| topic | heat supply network coolant automation energy efficiency energy saving modernization of heat supply system |
| url | https://ast.tyuiu.ru/jour/article/view/159 |
| work_keys_str_mv | AT tszhilina usingtheboosterpumpingstationsformodernizationofheatsupplysystem AT mnsabukevich usingtheboosterpumpingstationsformodernizationofheatsupplysystem AT vudinhdang usingtheboosterpumpingstationsformodernizationofheatsupplysystem AT wijesundarajanaka usingtheboosterpumpingstationsformodernizationofheatsupplysystem |