Crane Lifting Optimization and Construction Monitoring in Steel Bridge Construction Project Based on BIM and UAV
Modular construction methods are adopted in many spatial and temporal limited projects. As the major equipment used in modular construction, the mobile crane affects the safety and efficiency of construction significantly. Currently, building information modeling (BIM) is widely adopted to improve t...
Saved in:
Main Authors: | Jiahao Tian, Sang Luo, Xinming Wang, Jing Hu, Jun Yin |
---|---|
Format: | Article |
Language: | English |
Published: |
Wiley
2021-01-01
|
Series: | Advances in Civil Engineering |
Online Access: | http://dx.doi.org/10.1155/2021/5512229 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
CHARACTERISING BIM-BASED CONSTRUCTION PROJECTS: A STRATEGIC AND CONTINGENT BIM APPLICATION MODEL
by: Oluseye Olugboyega, et al.
Published: (2019-09-01) -
Use of BIM with Modular Construction in Future Construction Techniques
by: Ali Ünay, et al.
Published: (2024-06-01) -
BIM Use Assessment (BUA) Tool for Characterizing the Application Levels of BIM Uses for the Planning and Design of Construction Projects
by: María J. Rojas, et al.
Published: (2019-01-01) -
Design and Construction of a Hydraulic Crane.
by: Twinamasiko, Nicholas
Published: (2024) -
A BIM-Enabled Workflow for the Rehabilitation of Heritage Steel Bridges
by: Andrei Crisan, et al.
Published: (2025-01-01)