Methodology of calculation of time reserves when planning the duration of NPP construction
Introduction. The issues of risk and problem situations arising during the construction of nuclear power plants, as well as methods of response and prevention of such scenarios are considered. The available analogues of the developed system among the known information systems which carry out calcula...
Saved in:
Main Authors: | A. S. Pavlov, R. V. Ostrovskii |
---|---|
Format: | Article |
Language: | English |
Published: |
Moscow State University of Civil Engineering (MGSU)
2024-10-01
|
Series: | Vestnik MGSU |
Subjects: | |
Online Access: | https://www.vestnikmgsu.ru/jour/article/view/401 |
Tags: |
Add Tag
No Tags, Be the first to tag this record!
|
Similar Items
-
Simulación digital de procesos de construcción de estructura en concreto: casos de estudio práctico en Bogotá Digital simulation of concrete structure construction: practical case-study in Bogota
by: Diego Echeverry, et al.
Published: (2008-08-01) -
METHODOLOGY FOR DATA COLLECTION IN SIMULATED IRRADIATIONS USING MONTE CARLO TECHNIQUES ON DICOM IMAGES FOR X-RAY FLUORESCENCE EMISSIONS LOCALIZATION IN HIGH ATOMIC NUMBER MATERIALS
by: Nicolás E. Martín, et al.
Published: (2024-12-01) -
Glucose Sensor Design Based on Monte Carlo Simulation
by: Gang Xue, et al.
Published: (2025-01-01) -
Research on Time-dependent Reliability of Subway Gearboxes Based on the Response Surface Method
by: Pei Bang, et al.
Published: (2023-02-01) -
RESEARCH ON TIME-DEPENDENT KINEMATIC RELIABILITY BASED ON TIME DOMAIN ERROR MODEL
by: WANG Shuai, et al.
Published: (2020-01-01)